Group 4Fill 1Fill 1Page 1inGroup 11outlookpaperPDFStarFill 1Group 6zipfacebookinstagramlinkedinsocial/twitter@2xFill 1Artboardarrowicons/closeFill 1 Copy 2burgerArtboardCombined ShapeCombined ShapeCombined ShapelunchCombined ShapeCombined ShapeCombined Shape

Discover FGC’s main operating facility operating 24/7 and see what it’s like to be behind the wheel on a driving simulator

Duration: 2:00
Number of participants: 25
Departures: Sunday 4 June, 10:00

The Operations Centre of FGC (COR) is located in Rubí, a town near Barcelona. It is the neuralgic centre of the operation and maintenance of FGC lines and trains. It includes a depot, a rolling stock workshop in charge of first level maintenance of Barcelona – Vallès trains and second level maintenance of all FGC’s passenger trains, and a permanent way workshop. In addition, the facilities include the integrated control centre, driving simulators and an exhibition area with heritage rolling stock. This is FGC’s main operating facility, working 24/7 to ensure safety, continuous and reliable operations and an efficient maintenance of infrastructures and trains.

Group max: 25.